| DETAILS |
| Length Overall | 76.20 m |
| Breadth | 24.38 m |
| GRT-NRT | 2320/696 |
| Depth Moulded | 4.88 m |
| Maximum Draft / DWT | 3.90 m / 4809 tons |
| Lightship Draft / Weight | 1.22 m / 1895 tons |
| Clear deck Space | 745 m2 (subject to deck layout) |
| Deck Strength | 15 t/m2 |
| CAPACITY |
| Fuel oil | 160 m3 |
| Fresh Water | 334 m3 |
| Rec Oil | 1118 m3 |
| Storage room | 400 m3 / 2 x 2 m access hatch |
| CRANE PERFORMANCE |
| Maker | Manitowoc |
| Type | 16000 |
| Built | 2008 |
| Main Boom | 30 to 96 m |
| Extended upper boom point | 9 m |
| Available Hook Blocks | 1 x 272 tons + 2 x 100 tons + 1 x 45tons |
| Installed Counter Weights | Series III – 205 tons |
| AUXILIARY EQUIPMENT |
| Main Generator Set | 2 x CAT, 400 kVA |
| Air Compressor | LP Air Compressor E-Drive, 10.2 m3 / min @ 7bar / 55kW |
| Sewage Treatment | MINI BIOCON STP, 2500 liters / 24 hours |
| MOORING EQUIPMENT |
| Type | 4-point mooring system |
| Winches | 4 x 30 tons Transvictory Hydraulic Single Drum Winch |
| Winches Pull Load Test (SWL) | 30 tons @ 1st Layer |
| Winches Brake Holding Test | 45 tons @ 1st Layer |
| Winches Wires | Each drum is fitted with 600 m steel wire rope of 36 mm diameter |
| Winches Powerpack | 2 x 90 kW Elec-Hydraulic |
| Anchors | 4 x Delta Flipper @ 5 tons |
| Fairleads | 4 x Roller Fairleads, SWL 80 tons |
| 4 x Anchor Fairleads Deck Mounted, SWL 75 tons |
| Towing Brackets | 2 x Tow Bracket, SWL 30T Fwd |
| 2 x Tow Bracket, SWL 30T Aft |
| Bollards | 8 x Double Bollards, SWL 38 tons |
| Fendering | Truck Tires |
| ACCOMMODATION |
| Berths | 2 x 4 berth |
| Office | 15 m2 |
| Galley | 1 |
| Toilet / Shower block | 1 |
| VIDEO PRESENTATION | https://youtu.be/vYvxxn3oppo |